Engineering Factory

Alchrist Engineering Ltd in Essex had no heating in the manufacturing area of their factory. Having endured a freezing winter they urgently needed a heating solution before the onset of more cold weather. Key requirements were a cost effective and energy efficient system that could be installed with minimal interference to production.

Two Ingenious Air® Small Duct Systems were installed, in conjunction with two 30kW gas fired hot water boilers, to provide heating.

Download the case study >